Pedestal:
Completed 2023 05 09
STEP 01: Cut grooves for T- Mold.
Place pedestal side wall in portable work bench.
Chip board 19mm Black.
Use a T-Mold cutter (Ali-Express)
Cut grooves . running router once on top surface and then on bottom surface.
This ensures the groove is centered.
STEP 6: Assemble the side walls and the top and bottom floors
STEP 11: glue additional edge strips 2 x 20mm
Drill cable Holes on top floor.
Drill air holes in back panel.
Add "Lego" disks to top floor.
STEP 15:
Cut and assemble telescoping draw support for front flap.
STEP 15: Add floors to inside of pedestal.
Minutes
Edge line the Side walls
01. 40 min : Mount T-Mold on front edge of side walls .
02. 45 min : Glue and bend Flat edge onto all other edges .
03. 15 min : Cut all Struts for Pedestal and Drill .
04. 30 min : Assemble struts onto roof and floor of pedestal. assemble rollers.
05. 15 min : Drill struts for front wall and back wall.
06. 10 min : Assemble struts onto pedestal.
07. 15 min : Assemble front plate.
08. 20 min : Cut and glue back cover.
09. 30 min : Assemble Front flap with hinges.
10. 30 min : Drill vent holes on back cover, drill cable hole on top floor.
11. 45 min : Cut , drill and assemble Struts for two floors (shelves) inside pedestal.
12. 30 min : Cut , drill and assemble telescope for front flap.
Total : 5 hours at SF20/h = SF 100
hmmm
ReplyDelete